| Farnborough College. Descaling of the hot water system - the storage cylinder and circulation system. The boiler is 2m BTUs (600Kw) | |
![]() |
![]() |
| Kenilworth - Factory. Power flush and descale of the 15 years-old system. |
|
![]() |
![]() |
| Army Pay Corps. 50 year-old boiler. The system was cleaned using special chemicals and over a period of three months the pipework was thoroughly cleaned out.. A rust prevention regime has been introduced and the system will now continue operating for many years. |
|
![]() |
![]() |
Do you have: • Cold radiators? • Noisy boiler? • High fuel bills? We can help you! Read on... |
Based at: Manor Cottage, Church Lane, Arnesby, Leicester, LE8 5UU and at: Georges Road, Islington, London N7 Tel: 0116 2478791 or 07738 356432 |