Background
The
office complex is let to around 40 tenants on a serviced basis which
includes heating.
The building is spread over five floors and two blocks and has a total
of 550 radiators including 40 specially fabricated angle radiators.
The boiler (right) was installed in 1976 and has an output of 2½m
BThUs. |
Problems experienced.
The system was generating air which meant that staff were continually
having to vent radiators. Some of the radiators were failing and
are not now replaceable. In addition, many of the thermostatic radiator
valves were sticking.
The Owners of the building thought that they were looking at replacement,
not repair - an operation that would have cost around £3m and which
would have caused massive disruption to the tenants. |
Action Taken
The
whole system was flushed out ten times to remove sludge, using
Kamco FX2. A system-safe inhibitor was added to protect against future
erosion.
A biocide, AF10 was added to the system to eliminate water based bacteria. |
A
Magnaclean magnet, probably the largest ever used in the UK, was
inserted into the pipework to extract metallic debris from the system.
|